Bathroom renovations
Full bathroom and ensuite renovations, from strip-out to the final clean. One person manages the whole job, you get a clear fixed quote up front, and the work is done properly underneath as well as on the surface.
What’s included
A bathroom renovation involves a lot of trades and steps. We organise all of them so you don’t have to.


Bathroom styles
Every bathroom is different. Here are some of the most common types of job we do across Adelaide.

Frameless or semi-frameless screens and level or low-step entries. Easier to clean and to get in and out of.

Clean lines, large-format tiles, wall-hung vanities and simple storage that keeps the room uncluttered.

Step-free showers, grab rails, comfort-height toilets and slip-resistant tiles for ageing in place.

Smart layouts, recessed niches and the right fixtures to make a small room feel bigger.

Ensuites that fit the space you have, from a tight upgrade to a new room off the main bedroom.

Hard-wearing finishes, a bath if you need one, and plenty of storage for a busy household.
The process
Typical timeframe once work starts: 2 to 3 weeks for a complete bathroom. We confirm this for your job in the quote.
Start with a free quoteWe visit, look at the space, talk through what you want and take measurements. You get a written, itemised quote.
We help you choose the layout, tiles, tapware, vanity and fixtures, and lock in a start date that suits you.
Strip-out, plumbing, electrical, waterproofing, tiling and fit-off, managed by one person with regular updates.
We go over every detail with you, fix anything that isn’t right and leave the room clean and ready to use.
FAQ
Straight answers to the things people ask us most.
Still have a question?
0432 257 370A complete bathroom renovation takes around 2 to 3 weeks once work starts, depending on the size of the job and the plumber’s and electrician’s schedules. Smaller ensuites can be quicker and larger or more complex jobs can take longer. We’ll give you an expected timeframe with your quote and keep you updated if anything changes.
Yes. Waterproofing is part of every bathroom renovation we do and is completed before any tiles go down. We always follow the National Construction Code (NCC) and AS 3740, the Australian Standard for waterproofing domestic wet areas.
Usually not. Once the old bathroom is stripped out, it can’t be used until the job is finished. If it’s your only bathroom, talk to us at the quote stage and we’ll plan the work to keep the downtime as short as possible.
We visit, measure up and talk through what you want. You then get a written, itemised fixed quote that shows exactly what’s included. If something unexpected turns up once walls or floors are opened up, we explain it and agree on any changes with you before going ahead.
It depends on the size of the room, the layout and the fixtures and finishes you choose. As a guide, a basic bathroom renovation is around $8,000 to $15,000, mid-range $15,000 to $30,000, and high-end $30,000 to $45,000 or more. The quickest way to get an accurate figure is a free measure-up and quote.
Either works. We usually supply the tiles, and if you know exactly what you want we can supply tapware and fixtures too. Many clients prefer to buy their own tapware, vanity and fixtures so the warranty sits directly with them and the supplier. We’ll talk you through the options when we quote.
Keep exploring

Free quote
Tell us about your bathroom. We’ll come out, measure up and give you a clear, fixed quote with no obligation.
Servicing all of Adelaide and the Greater Adelaide area. See all suburbs.